최신 1z0-1075-24 무료덤프 - Oracle Manufacturing Cloud 2024 Implementation Professional
During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.
What must they do to achieve this?
What must they do to achieve this?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.
Which setup task must you perform in the Manage Plant Parameters section to achieve this?
Which setup task must you perform in the Manage Plant Parameters section to achieve this?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Two work definitions are created in the application: one for Engine Finished Good and the other for Pallet Finished Good. The Engine Finished Good item should have Pallet Finished Good as one of its components.
How can you establish the relationship between the Pallet and Engine work definitions?
How can you establish the relationship between the Pallet and Engine work definitions?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must they perform and verify in the Work Definition area?
Which three steps must they perform and verify in the Work Definition area?
정답: A,B,D
설명: (DumpTOP 회원만 볼 수 있음)
A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.
What is the correct sequence of tasks to achieve this?
What is the correct sequence of tasks to achieve this?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)