최신 1z0-1075-24 무료덤프 - Oracle Manufacturing Cloud 2024 Implementation Professional

A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, the supervisor finds a General Information, Operations, and History tab, but no Reservations tab.
What are two reasons for the Reservations tab not being displayed for WO-1025?

정답: A,B
설명: (DumpTOP 회원만 볼 수 있음)
Which three statements are true about executing rework work orders with manual control?

정답: A,B,E
설명: (DumpTOP 회원만 볼 수 있음)
Your customer runs two daily shifts in their plant: morning shift and evening shift. A resource, LATHE, is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the morning shift and the remaining units for the evening shift.
Which two actions must the customer perform to associate LATHE with W1?

정답: C,F
설명: (DumpTOP 회원만 볼 수 있음)
In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
In the work execution area, which three infolets are provided to users for instant access?

정답: B,C,E
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기