At what stage(s) in the manufacturing process are quality tests performed?
정답: A
When attempting te complete a work order using Super Backflush (P31123), the system generates the following error message: "Work Center Rates Not Set Up (error ID 4474)".
However, when checking the work centers, the rates are set up correctly. The Super Backflush process cannot be completed. What Information should be checked?
However, when checking the work centers, the rates are set up correctly. The Super Backflush process cannot be completed. What Information should be checked?
정답: B
Which three are valid Assembly Inclusion Rules?
정답: A,B,E
Which two statements about Rate Schedules are true?
정답: B,C
What are the outputs of MRP? (select 3)
정답: A,B,E
When changing the Bill of Material through an Engineering Change Order, which three statements are TRUE?
정답: A,D,E
Daily Planning generates:
정답: B,D