What are workload design requirements related to?

정답: C
An architect is tasked with expanding an existing VMware software-defined data center (SDDC) solution so that it can be used to deliver a virtual desktop infrastructure (VDI) service off-shore development activities.
The production environment is currently delivered across two geographically dispersed data centers. The two data centers are currently connected to each other through multiple diversely routed, high bandwidth and low latency links.
The current operations management components are deployed to a dedicated management cluster that is configured with N+1 redundancy. The current VMware software-defined data center (SDDC) has a monthly availability target of 99.5%, which includes all management components.
The customer requires that the new solution scale to support the concurrent running of 500 persistent virtual desktops. The virtual desktops must not share the same virtual infrastructure as existing virtual machines, but can be managed using the same VMware operations management components.
Any new VDI service management components must be installed into the management cluster. There is no requirement to back up the virtual desktops because all relevant user data is stored centrally. The VDI service is providing business critical services and must have an availability target of 99.9%.
Given the information from the customer, which two assumptions would the architect include in the design? (Choose two.)

정답: C,D
Which requirement focuses on the uninterrupted operation of the vSphere environment during disruptions?

정답: A
What is a benefit of using a scale-out method for handling vSphere cluster growth?

정답: A
Which requirement would be classified as a functional requirement within the design documentation?

정답: A
Which aspect of a vSphere design is concerned with the availability of critical applications and services?

정답: B
An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.
Which design decision should the architect make to maximize availability for backups?

정답: B
When performing a vSphere upgrade, what is the best practice to ensure compatibility with existing hardware, software, and third-party plugins?

정답: C
What do capacity requirements for a vSphere design help determine?

정답: D
What does defining a workload cluster design objective involve?

정답: D