최신 3V0-21.23 무료덤프 - VMware vSphere 8.x Advanced Design

An architect is planning the physical server configuration for a vSAN-based infrastructure.
Which operations mode should a RAID controller support to minimize potential server downtime during physical disk failures?

정답: A
Which feature enables live migration of a running virtual machine from one ESXi host to another with zero downtime?

정답: B
Which requirements specify the number of virtual machines and cores needed for a virtualized system?

정답: D
An architect is designing a new vSphere environment to meet the following requirements:
- The environment must support 5,000 virtual machines.
- The environment will be built initially using 350 hosts.
Which vCenter Server appliance deployment size should the architect specify for the design?

정답: D
Which element of a design includes physical server specifications, network configurations, and storage details?

정답: D
During a requirements gathering workshop, the customer provides the following requirement (REQ) and constraints (CON):
- REQ01: The customer is looking for a way to limit database virtual machine (VM) placement to save on CPU licensing costs.
- CON01: There is a single cluster with no budget to scale.
- CON02: All virtual machines must run on the consolidated cluster.
Which two design decisions should the architect make to meet the customer requirement? (Choose two.)

정답: B,D
An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.
During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:
- The solution must support the concurrent running of 1,000 virtual machines
- The production environment must be delivered across two geographically dispersed data centers
- All virtual machines must be capable of running in either data center.
- The two data centers are currently connected to each other through a single but diversely routed, high bandwidth and low latency link.
- The link between the two data centers is capable of supporting a round-trip time (RTT) of 150 ms
- The existing server hardware standard document states that all virtual infrastructure hosts must be deployed using vSAN ReadyNodes
- The service owner has stated that it is critical to ensure the availability target of 99.9%
- All virtual machine backups must be completed using the existing backup service
- The recovery time objective (RTO) for the service is five minutes
- The recovery point objective (RPO) of the service is four hours
Which two elements represent risks to the successful delivery of this solution? (Choose two.)

정답: D,E
An architect is tasked with designing the vSphere cluster layout for a customer. The customer is NOT sure how many clusters are required or the number of hosts to use in any of the clusters.
The customer has provided the following requirements:
- The placement of Linux and Windows machines (end user virtual machines) needs to be controlled for license compliance.
- Access to virtual machines such as Active Directory and DHCP (infrastructure virtual machines) should be restricted to just the platform administration team.
- Infrastructure virtual machines should not prevent end user virtual machines from consuming their allocated resources.
- Utilization for the current infrastructure's virtual machines is less than end user virtual machines.
- The platform needs to provide the ability to lifecycle manage the hosts without impacting end user virtual machines.
- The platform needs to account for the predicted future growth of end user virtual machines being very high, while for infrastructure virtual machines being very low.
- There are a total of 15 physical servers for use across the platform.
Which of the proposed cluster layouts would meet the customer's requirements?

정답: C
An architect is designing a new greenfield environment that will install ESXi on local disks. There is a requirement to streamline initial and future installations of ESXi hosts.
Which configuration option should the architect recommend for installing ESXi hosts to meet these requirements?

정답: A
During a requirements gathering workshop, the customer's Chief Information Security Office (CISO) provides the following requirements that are pertinent to the design of a new vSphere environment:
- All operating system critical patches must be installed within 24 hours of release.
- All virtual machine templates must be updated every three months in line with company policy.
Which requirement classification is being gathered for the design documentation?

정답: B