최신 400-007 무료덤프 - Cisco Certified Design Expert (CCDE v3.0) Written
Company XYZ has a multicast domain that spans across multiple autonomous systems. The company wants to choose a technology that provides simplified and controlled approach to interconnecting the multicast domains. Which technology is the best fit for this purpose?
정답: B
End users are moving swiftly toward a hybrid cloud model to support faster IT service delivery. To implement a hybrid cloud architecture, what are two critical requirements for broader cloud service provider and vendor interoperability in terms of cloud security and compliance? (Choose two.)
정답: C,D
When consumers that leverage laaS reach 100% resource capacity, what can be used to redirect the overflow of traffic to the public cloud so there is no disruption to service?
정답: B
Which two impacts of adding the IP event dampening feature to a network design are true? (Choose two.)
정답: C,E
Company XYZ wants design recommendations for Layer 2 redundancy (using Layer 2 technologies) The company wants to prioritize flexibility and scalability elements in the new design Which two technologies help meet these requirements'? (Choose two)
정답: B,D
A multicast network is sing Bidirectional PIM. Which two combined actions achieve high availability so that two RPs within the same network can act in a redundant manner? (Choose two)
정답: A,C
설명: (DumpTOP 회원만 볼 수 있음)
A small organization of 20 employees is looking to deliver a network design service for modernizing customer networks to support advanced solutions.
Project scope and weekly progress should be visualized by the management.
Always consider feedback and make changes accordingly during the project.
Should consider flexibility to change scope at the point of time.
Which project methodology meets the requirements and have the least impact on the outcome?
Project scope and weekly progress should be visualized by the management.
Always consider feedback and make changes accordingly during the project.
Should consider flexibility to change scope at the point of time.
Which project methodology meets the requirements and have the least impact on the outcome?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Refer to the exhibit.

An engineer is designing the traffic flow for AS 111. Traffic from AS 111 should be preferred via AS 100 for all external routes. A method must be used that only affects AS 111. Which BGP attributes are best suited to control outbound traffic?

An engineer is designing the traffic flow for AS 111. Traffic from AS 111 should be preferred via AS 100 for all external routes. A method must be used that only affects AS 111. Which BGP attributes are best suited to control outbound traffic?
정답: A
Which relationship between IBGP and the underlying physical topology is true?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Which aspect of BGP-LS makes it scalable in large network when multiarea topology information must be gathered?
정답: B
Refer to the exhibit.

A new high availability DB sever cluster is installed in the network.
These two servers require high bandwidth and low latency Layer 2 connectivity for database replication.
Which solution supports these requirements?

A new high availability DB sever cluster is installed in the network.
These two servers require high bandwidth and low latency Layer 2 connectivity for database replication.
Which solution supports these requirements?
정답: B
Refer to the exhibit.

Company XYZ is currently running IPv4 but has decided to start the transition into IPv6. The initial objective is to allow communication based on IPv6 wherever possible, and there should still be support in place for devices that only support IPv4. These devices must be able to communicate to IPv6 devices as well. Which solution must be part of the design?

Company XYZ is currently running IPv4 but has decided to start the transition into IPv6. The initial objective is to allow communication based on IPv6 wherever possible, and there should still be support in place for devices that only support IPv4. These devices must be able to communicate to IPv6 devices as well. Which solution must be part of the design?
정답: B
Refer to the table.

A customer investigates connectivity options for a DCI between two production data centers to aid a large-scale migration project. The migration is estimated to take 20 months to complete but might extend an additional 10 months if issues arise. All connectivity options meet the requirements to migrate workloads. Which transport technology provides the best ROI based on cost and flexibility?

A customer investigates connectivity options for a DCI between two production data centers to aid a large-scale migration project. The migration is estimated to take 20 months to complete but might extend an additional 10 months if issues arise. All connectivity options meet the requirements to migrate workloads. Which transport technology provides the best ROI based on cost and flexibility?
정답: D
How must the queue sizes be designed to ensure that an application functions correctly?
정답: A