Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.
Note: There are 3 correct answers to this question.
정답: C,D,E
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following elements does MRP take into account during net requirement calculation? Note:
There are 2 correct answers to this question.
There are 2 correct answers to this question.
정답: A,B
설명: (DumpTOP 회원만 볼 수 있음)
How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.
Note: There are 3 correct answers to this question.
정답: A,D,E
설명: (DumpTOP 회원만 볼 수 있음)
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
정답: C,D,E
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?
Note: There are 2 correct answers to this question.
Note: There are 2 correct answers to this question.
정답: A,B
설명: (DumpTOP 회원만 볼 수 있음)
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?
정답: A