최신 CDCS 무료덤프 - EXIN EPI Certified Data Centre Specialist

In which stage of the data center life cycle does commissioning take place?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
What should be considered when installing overhead data cabling?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
From the options indicated, what is the correct starting point for the raised floor installation?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
What is the minimum requirement for the power feeds to the building for a Rated-3 data center based on the ANSI/TIA-942 standard?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
The temperature in the computer room is being increased from 18°C/64°F to 27°C/81°F.
What is the impact, if any, on the amount of gas required to suppress a fire assuming the gas is a Halocarbon?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.
What should you recommend?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기