최신 CQE 무료덤프 - ASQ Certified Quality EngineerExam

Which of the following types of planning uses a strategic planning process that relates idealistic goals to work strategy?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The table below shows the results of inspecting 3,752 items. On the basis of this information, a Pareto chart would show what cumulative percent of nonconformities by the end of the third operation?
Order of OperationNumber of Nonconforming ItemsPercent of Nonconforming ItemsPercent of Nonconformities
1-3729.9%55.0%
2nd1564.2%23.3%
3 rd782.1%11.7%
4*501.3%7.2%
5th200.5%2.8%
Calculator

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
If a value assigned to a unit is non-numerical. it is described as

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following statements is true regarding a failure mode and effect analysis (FMEA)?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
When a company is developing a quality information system, the most important factor is the

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following is the most important aspect of a successful quality improvement effort?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The sample size for ANSI ASQ Z1.4. Level II plan is based on the

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following tools should be used to break a broad goal into increasingly detailed levels?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
The following components (1,2,3) each have reliabilities of 0.95.

What is the system reliability?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following tools specifies the use of a feedback cycle?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기