Failure modes and effects analysis involves what activity?
Response:
Response:
정답: A
Internal testing sources of component reliability data are:
Response:
Response:
정답: D
Which of the following is (are) NOT (a) failure mechanism (s)?
l. Cracked
ll. Over-stressing.
lll. Inadequate maintenance instructions.
lV. Oxidized.
Response:
l. Cracked
ll. Over-stressing.
lll. Inadequate maintenance instructions.
lV. Oxidized.
Response:
정답: B
Which of the following forms of reliability data will BEST provide valuable information on product usage and reliability?
Response:
Response:
정답: C
In general, consumer consider reliability and safety to be a
Response:
Response:
정답: A
A system is made up to several identical parts of varying age. The reliability of each of these parts is given by R( t) = e - λt where λ is the failure rate in failures per hour and t is the operating time in hours.
Which of the following is TRUE about the reliability of these parts?
Response:
Which of the following is TRUE about the reliability of these parts?
Response:
정답: C
For complex electronics systems, the major contributor to repair time is generally:
Response:
Response:
정답: B
Under a cost of reliability model, which of the following factors is used to determine warranty costs?
Response:
Response:
정답: C
If a company monitors field reliability using both 6 and 12 month MTBF moving average, a comparison of the average will generally show that the 12 month moving averages Response:
정답: B
Random sampling plans are based on which of the following assumption?
Response:
Response:
정답: D
Which one of the following quantitative methods does NOT apply to the assessment of actual system/component reliability?
Response:
Response:
정답: C
In the binomial expression:
Response:
Response:
정답: C
Using complete field-based data, a reliability engineer has analyzed the reliability growth of a repairable system over the last 24 months. The analysis suggests a "no growth" condition, and that finding is reported to management.
Due to a pending multimillion dollar order, management requests that a line be drawn to show growth where none actually exists. The engineer's department manager directs the engineer to comply with management request.
According to the ASQ Code of Ethics, which of the following is an appropriate action for the engineer to take next?
Response:
Due to a pending multimillion dollar order, management requests that a line be drawn to show growth where none actually exists. The engineer's department manager directs the engineer to comply with management request.
According to the ASQ Code of Ethics, which of the following is an appropriate action for the engineer to take next?
Response:
정답: A
Which of the following statement is TRUE about environmental stress screening (ESS)?
Response:
Response:
정답: C
The success of the FMEA is principally dependent on:
I. Good communication between the reliability engineer and the designer.
II. Use of the correct form and definitions.
III. Early determination of the reliability critical items.
Response:
I. Good communication between the reliability engineer and the designer.
II. Use of the correct form and definitions.
III. Early determination of the reliability critical items.
Response:
정답: D
High cycle fatigue would MOST likely result in
Response:
Response:
정답: B
The factorial of 8 is:
Response:
Response:
정답: A
What is this system's reliability at 3000 hours?
MTBFs for the components are :
A = 2500 hours B = 3700 hours C = 2000 hours D = 4000 hours.
Response:
MTBFs for the components are :
A = 2500 hours B = 3700 hours C = 2000 hours D = 4000 hours.
Response:
정답: A
Develop the fault tree analysis for a candy dispensing machine. There are two contributing subsystems, both of them must fail for the system to fail. The electronic release has Pf = 0.04 and the coil spring release has Pf = 0.06. What is the system's probability of failure?

Response:

Response: