최신 CTS 무료덤프 - AVIXA Certified Technology Specialist
When is the optimal time to conduct training of end users in a new AV installation?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Which area of this building is likely to have more stringent regulations for cable insulation materials than any other area?
Select the answer by clicking on the correct area within the section view.

Select the answer by clicking on the correct area within the section view.

정답:

Explanation:
The correct answer is the Air Plenum area - the space above the ceiling tiles used for air circulation in HVAC systems.
According to NFPA 70: National Electrical Code (NEC) and referenced in the AVIXA CTS Exam Guide, cabling run through plenum spaces must meet stringent fire and smoke safety standards. This is because if a fire occurs, the plenum area can rapidly spread smoke and toxic fumes throughout a building.
From the CTS Exam Guide (5th Edition), under Chapter 2: Infrastructure, it states:
"Plenum-rated cable is required in spaces used for environmental air (plenum spaces), as these cables are designed with fire-retardant jackets that emit low smoke. Non-plenum cable cannot be used unless it is enclosed in a conduit rated for plenum use."
- AVIXA CTS Exam Guide, Chapter 2, p. 42-44
During system verification, an issue has been noted where the microphone becomes very quiet when any laptop audio is played. What should be reviewed in the audio DSP?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The bending or changing direction of a light ray as it passes through material is called
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Installing an AV system generates a lot of debris. When is the BEST time to identify if there will be a place to dispose of the debris?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
During a site survey, a sound pressure level (SPL) meter can be used for measuring
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Maintaining AV operations includes which of the following?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The architect states that the project is in the pre-design phase. This would indicate that
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
The best practice for tagging AV equipment for inventory management is to
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which document is used to clarify a project design issue?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)