The default management authority user name of the ECC800 is admin, and admin has all the authority to operate the WEB interface functions.
정답: A
What are the i3 features of FusionModule2000 V3.0 include? (Multiple choice)
정답: A,B,C
NETECO cannot perform centralized and unified management of data center infrastructure in multiple regions.
정답: B
The humidifier used by NETCOL8000-A is ().
정답: D
When the UPS5000-E is equipped with IP21 components, the top air components can also be installed at the same time.
정답: B
Fusion Module2000 is an outdoor prefabricated integrated data center solution.
정답: B
Which of the following air supply methods must have a reasonable raised floor height?
정답: A
What is the lightning protection level of the integrated UPS of FusionModule2000?
정답: A
When there are multiple computer rooms and they are monitored at the same time, the hierarchical deployment of the monitoring system may occur.
정답: B
What are the fire-fighting linkage functions of FusionModule2000? (Multiple choice)
정답: A,B,C,D
When UPS2000-G shuts down the single machine of the shutdown system, it needs to ().
정답: D
During filling refrigerant for NetCol5000-A, there is no need to put the refrigerant steel cylinder upside down on balance.
정답: B
Which of the following contents does NETCOL5000-A maintain for the electrode humidifier without dismantling the humidifying barrel? (Multiple choice)
정답: A,B,C,D
UPS5000-E has a wide voltage and frequency input range, which can be applied to harsh grid environment and prolong battery life. What is the input voltage range of UPS5000-E with full load?
정답: B
Which of the following descriptions for the configuration of the PDU8000 modular precision power distribution cabinet is correct?
정답: B
In the FusionModule2000, if a device port complies with the Modbus RTU protocol, which device is used to connect to smart ETH gateway?
정답: C
In UPS, corresponding to 50k modules, the maximum output capacity of a single UPS is?
정답: C
With IT load of 80kW, a UPS system of 80kVA can meet the basic needs.
정답: B
When the battery is discharged, the discharge voltage of a faulty battery drops rapidly, and the backup time of the entire battery rented in the morning is not enough, so it should be dealt with ().
정답: D
Which is not part of the routine maintenance item of the ECC800 power module?