One sunroof actuator can drive up to () sunroof solenoid valves at the same time.

정답: A
What can users do through the ECC800WEB interface? (Multiple choice)

정답: A,B,C,D
When installing the power line of UPS5000-E, if the main and side sources are different, you need to remove the bronze plate connecting the bypass and the main circuit first, and then connect the main circuit and the bypass input respectively.

정답: B
Huawei air-cooled air conditioners (25kw and 42kw) one indoor unit corresponds to one outdoor unit.

정답: A
If the UPS5000-400K cuts the bypass and closes the maintenance side station, both the main power module and the bypass module stop working.

정답: A
UPS5000- has the function of adjustable number of battery cells, which can avoid the replacement of gangs caused by single battery failure, and solve the problem of difficult maintenance of traditional UPS batteries. How many adjustable batteries does UPS5000-E (50kVA module) support?

정답: A
Which of the following are the basic functions of NETECO? (Multiple choice)

정답: A,B,C,D
UPS5000-series modular UPS product features are similar to which of the following product models?

정답: D
Which of the following actions may be triggered after the high liquid level float of a Huawei chilled water precision air conditioner floats longer than the specified duration?

정답: C
Which of the following position is recommended for installing the smart ETH gateway?

정답: A
UPS5000-E has a wide voltage and frequency input range, which can be applied to harsh grid environment and prolong battery life. What is the input voltage range of UPS5000-E with full load?

정답: B
What items need to be checked after the UPS5000-E system is installed? (Multiple choice)