Jan is a Contracts Manager at ABC Ltd and has recently awarded a contract to XYZ Ltd. Describe how she can manage the contract and supplier, detailing ways of monitoring performance and adding value for ABC Ltd (25 marks)
정답:
See the solution inExplanation partbelow.
Explanation:
How to approach this question:
- There are 4 sections to this essay, so before you start writing I'd make a couple of notes on each of the points. Then build those notes into separate paragraphs. Your notes may look like this:
How to manage the contract - ensuring contract is fit for purpose, holding XYZ to their responsibilities, ensuring ABC are also fulfilling their responsibilities, issuing contract variations if required, planning for contingencies.
- How to manage the supplier - ensure the right relationship is in place (transactional vs collaborative), communication - open and honest, ensure there is mutual trust and understanding of each other's goals/ objectives.
- Ways of monitoring performance - use KPIs / SLAs, Supplier Scorecard, Vendor Rating, feedback from customers
- How to add value for ABC - increasing efficiencies (e.g. less product defects), improved quality, assisting with Value Engineering exercises, reduction in time and costs (e.g. through improved processes such as ordering), the supplier delivers 'extras' for ABC such as training to staff at no additional cost.
- Ensure each paragraph refers to Jan, ABC and XYZ. The question doesn't state what the businesses are buying/ selling so you can use this as an opportunity to provide examples: 'if ABC are procuring raw materials from XYZ such as metal, an effective way to manage performance would include .... If they are procuring a service, it may be more beneficial to use .... methodology' Example Essay Jan, the Contracts Manager at ABC Ltd, plays a pivotal role in ensuring the success of the recently awarded contract with XYZ Ltd. Efficient contract and supplier management involves careful planning, communication, performance monitoring, and the continuous addition of value. Here's how Jan can navigate these aspects:
In terms of contract management, Jan must ensure that the terms and conditions of the contract are "fit for purpose," aligning with the specific needs and complexity of the procurement. For instance, a simple goods procurement may necessitate a concise document, while more intricate projects like engineering endeavors may require a detailed contract such as a JCT or NEC contract. Additionally, Jan should vigilantly manage the contract during its lifespan, addressing any potential 'scope creep' that might necessitate amendments. If the contract lacks provisions for such changes, Jan may need to initiate the creation of a new contract to accommodate evolving needs Clear delineation of responsibilities and contingencies is crucial in the contract to ensure accountability and preparedness for unforeseen circumstances. The inclusion of Key Performance Indicators (KPIs) and damage clauses, where appropriate, adds a layer of clarity and accountability to the contractual relationship. Planning for contingencies involves having backup strategies in place, especially considering potential challenges that may arise during the collaboration with XYZ Ltd. For example, having other suppliers she can call upon if XYZ fail to deliver on an order.
Turning to supplier management, Jan's role involves fostering a positive and productive relationship with XYZ Ltd. This includes regular meetings to discuss progress, achievements, and future plans. A mobilization meeting is particularly important to ensure a strong start to the contract. Subsequent monthly or quarterly meetings provide a platform to review performance retrospectively and plan for the future. Additionally, effective communication is paramount, with Jan ensuring that both organizations regularly communicate, particularly regarding urgent issues that may require immediate attention. This proactive communication can occur through various channels, such as email or phone calls, facilitating a swift resolution of any emerging concerns.
Trust and honesty form the bedrock of the relationship between ABC Ltd and XYZ Ltd. Jan should work towards fostering mutual trust through both formal and informal activities, recognizing the importance of a transparent and cooperative partnership In terms of performance monitoring, Jan can employ Key Performance Indicators (KPIs) and Service Level Agreements (SLAs) to track performance regularly. These metrics should not be viewed as one-off activities but rather as ongoing tools for assessing and ensuring that performance aligns with expectations. Clear communication regarding the consequences of failing to meet these targets, such as the implementation of a Performance Improvement Plan or potential contract cancellation, is essential for maintaining accountability.
Regular performance meetings between ABC Ltd and XYZ Ltd provide an opportunity to discuss achievements, setbacks, and any necessary adjustments. Beyond quantitative metrics, surveys and feedback from customers can provide qualitative insights into performance.
Finally, Jan can contribute to the partnership's success by focusing on adding value. This involves going above and beyond the contractual obligations, such as delivering products more efficiently at no additional cost or improving operational efficiencies. Encouraging XYZ Ltd to participate in Value Engineering exercises and engaging in Early Supplier Involvement to shape and define future requirements would be a good example of this. Additionally, providing 'add-ons' or 'extras' outside the contractual framework, such as training for ABC Ltd staff, further enhances the value derived from the partnership.
In conclusion, Jan's role as Contracts Manager extends beyond the initial awarding of a contract- rather her role involves strategic contract and supplier management throughoutthe lifetime of the professional relationship. By ensuring the contract is well-suited for its purpose, fostering a positive relationship with the supplier, monitoring performance effectively, and consistently adding value, Jan contributes to the success of the collaboration between ABC Ltd and XYZ Ltd. This comprehensive approach sets the stage for a mutually beneficial and enduring partnership.
Tutor Notes:
- A case study question like this in the real exam is likely to come with more details. They often come with lots and lots of details to be honest, talking about what XYZ supplies to ABC and the names of the people involved. The case study usually gives you some good clues as to what the examiner will be looking for you to include, so do read them carefully.
- You don't have to include much 'theory' on case study questions - the important thing is to reference Jan as much as possible. BUT you could throw in a cheeky mention of the Kraljic matrix. The approach to managing the contract and supplier would depend on the type of item supplied by XYZ - e.g. if it is a bottleneck item the supplier may need to be handled differently to if it is a routine item. You could also mention KPIs and objectives as being 'SMART' - Specific, Measurable, Attainable, Relevant, and Time-Bound
- study guide p.86-90 / p.94 / p.96 -98
Explanation:
How to approach this question:
- There are 4 sections to this essay, so before you start writing I'd make a couple of notes on each of the points. Then build those notes into separate paragraphs. Your notes may look like this:
How to manage the contract - ensuring contract is fit for purpose, holding XYZ to their responsibilities, ensuring ABC are also fulfilling their responsibilities, issuing contract variations if required, planning for contingencies.
- How to manage the supplier - ensure the right relationship is in place (transactional vs collaborative), communication - open and honest, ensure there is mutual trust and understanding of each other's goals/ objectives.
- Ways of monitoring performance - use KPIs / SLAs, Supplier Scorecard, Vendor Rating, feedback from customers
- How to add value for ABC - increasing efficiencies (e.g. less product defects), improved quality, assisting with Value Engineering exercises, reduction in time and costs (e.g. through improved processes such as ordering), the supplier delivers 'extras' for ABC such as training to staff at no additional cost.
- Ensure each paragraph refers to Jan, ABC and XYZ. The question doesn't state what the businesses are buying/ selling so you can use this as an opportunity to provide examples: 'if ABC are procuring raw materials from XYZ such as metal, an effective way to manage performance would include .... If they are procuring a service, it may be more beneficial to use .... methodology' Example Essay Jan, the Contracts Manager at ABC Ltd, plays a pivotal role in ensuring the success of the recently awarded contract with XYZ Ltd. Efficient contract and supplier management involves careful planning, communication, performance monitoring, and the continuous addition of value. Here's how Jan can navigate these aspects:
In terms of contract management, Jan must ensure that the terms and conditions of the contract are "fit for purpose," aligning with the specific needs and complexity of the procurement. For instance, a simple goods procurement may necessitate a concise document, while more intricate projects like engineering endeavors may require a detailed contract such as a JCT or NEC contract. Additionally, Jan should vigilantly manage the contract during its lifespan, addressing any potential 'scope creep' that might necessitate amendments. If the contract lacks provisions for such changes, Jan may need to initiate the creation of a new contract to accommodate evolving needs Clear delineation of responsibilities and contingencies is crucial in the contract to ensure accountability and preparedness for unforeseen circumstances. The inclusion of Key Performance Indicators (KPIs) and damage clauses, where appropriate, adds a layer of clarity and accountability to the contractual relationship. Planning for contingencies involves having backup strategies in place, especially considering potential challenges that may arise during the collaboration with XYZ Ltd. For example, having other suppliers she can call upon if XYZ fail to deliver on an order.
Turning to supplier management, Jan's role involves fostering a positive and productive relationship with XYZ Ltd. This includes regular meetings to discuss progress, achievements, and future plans. A mobilization meeting is particularly important to ensure a strong start to the contract. Subsequent monthly or quarterly meetings provide a platform to review performance retrospectively and plan for the future. Additionally, effective communication is paramount, with Jan ensuring that both organizations regularly communicate, particularly regarding urgent issues that may require immediate attention. This proactive communication can occur through various channels, such as email or phone calls, facilitating a swift resolution of any emerging concerns.
Trust and honesty form the bedrock of the relationship between ABC Ltd and XYZ Ltd. Jan should work towards fostering mutual trust through both formal and informal activities, recognizing the importance of a transparent and cooperative partnership In terms of performance monitoring, Jan can employ Key Performance Indicators (KPIs) and Service Level Agreements (SLAs) to track performance regularly. These metrics should not be viewed as one-off activities but rather as ongoing tools for assessing and ensuring that performance aligns with expectations. Clear communication regarding the consequences of failing to meet these targets, such as the implementation of a Performance Improvement Plan or potential contract cancellation, is essential for maintaining accountability.
Regular performance meetings between ABC Ltd and XYZ Ltd provide an opportunity to discuss achievements, setbacks, and any necessary adjustments. Beyond quantitative metrics, surveys and feedback from customers can provide qualitative insights into performance.
Finally, Jan can contribute to the partnership's success by focusing on adding value. This involves going above and beyond the contractual obligations, such as delivering products more efficiently at no additional cost or improving operational efficiencies. Encouraging XYZ Ltd to participate in Value Engineering exercises and engaging in Early Supplier Involvement to shape and define future requirements would be a good example of this. Additionally, providing 'add-ons' or 'extras' outside the contractual framework, such as training for ABC Ltd staff, further enhances the value derived from the partnership.
In conclusion, Jan's role as Contracts Manager extends beyond the initial awarding of a contract- rather her role involves strategic contract and supplier management throughoutthe lifetime of the professional relationship. By ensuring the contract is well-suited for its purpose, fostering a positive relationship with the supplier, monitoring performance effectively, and consistently adding value, Jan contributes to the success of the collaboration between ABC Ltd and XYZ Ltd. This comprehensive approach sets the stage for a mutually beneficial and enduring partnership.
Tutor Notes:
- A case study question like this in the real exam is likely to come with more details. They often come with lots and lots of details to be honest, talking about what XYZ supplies to ABC and the names of the people involved. The case study usually gives you some good clues as to what the examiner will be looking for you to include, so do read them carefully.
- You don't have to include much 'theory' on case study questions - the important thing is to reference Jan as much as possible. BUT you could throw in a cheeky mention of the Kraljic matrix. The approach to managing the contract and supplier would depend on the type of item supplied by XYZ - e.g. if it is a bottleneck item the supplier may need to be handled differently to if it is a routine item. You could also mention KPIs and objectives as being 'SMART' - Specific, Measurable, Attainable, Relevant, and Time-Bound
- study guide p.86-90 / p.94 / p.96 -98
Explain 5 stages of the sourcing cycle that occur in the pre-contract stage (25 points)
정답:
See the solution inExplanation partbelow.
Explanation:
How to approach this question:
- The Sourcing Cycle is the first half of the CIPS Procurement Cycle and includes these steps:
1) Define Business Need
2) Market Analysis + Make vs Buy
3) Develop Strategy and Plan
4) Pre-Procurement Market Testing
5) Develop Documents and Specification
6) Supplier Selection
7) Issue Tender
8) Bid Evaluation
9) Contract Award and Implementation
Your response should detail 5 of these. It is a good idea to pick the ones you know most about and where there is more to write about. You won't get any extra points for naming more than 5 so focus on getting as much detail down about 5, rather than explaining more of them.
Essay Plan
Introduction - explain what the sourcing cycle is - the stages of the procurement cycle before a contract is signed. It describes the steps an organisation will take to source/ procures goods or services.
Paragraph 1 - Define the business need
How is the need identified? E.g. by end user, stores department, ERP system.
Procurement should challenge this - is it really necessary? Suggest alternatives - this could be a key source of added value
Put together business case / requisition / project initiation document
What type of purchase? Straight rebuy, modified rebuy, new purchase
Decide on what type of specification would be best - Conformance vs performance specification
This stage may include early supplier involvement
Paragraph 2 - Market Analysis and Make vs Buy Decision
Create an Analysis by segmenting the market by buyer, product, distribution channel, geography, customer market etc.
Make vs Buy - use Carter's Matrix to decide whether the organisation should make vs buy.
Also consider outsourcing at this stage
Paragraph 3 - Documents and Specification
Draft documents. These may include a RFQ or ITT, a specification and a proposed form of contract
Specification may be conformance or performance based
A contract sets out the roles, rights, responsibilities and obligations of the parties and shows intention to enter into 'legal relations'
This stage defines the 'offer' which becomes binding once other party accepts
Documentation may also include proposed KPIs and SLAs
Paragraph 4 - Supplier Selection
For a new purchase, supplier selection is very important - investigation should be proportionate to the value of the procurement. For rebuys or low-risk purchases you could use the same supplier or a list of pre-approved suppliers.
You can locate potential suppliers by; catalogues, websites, trade registers, market exchanges and review sites, trade or industry press, fairs and conferences, networking and recommendations/ referrals.
You can shortlist suppliers by sending out a pre-qualification questionnaire. This adds value by reducing wasted time / costs / risks to entering into a contract with the wrong supplier.
Other criteria for supplier selection include using Carter's 10 Cs (competency, consistency, capability, control, cost, cash, clean, communication, culture, commitment), thesupplier's financial standing (e.g. liquidity and gearing), references and considering their CSR policy.
Paragraph 5 - Issue Tender
Competitive bidding should only be done when there's sufficient time and resources available, there's sufficient suppliers in the marketplace, they're keen to win business (ie that there's appetite for competition) and there is a strong specification
Best practice is to issue tenders electronically as it ensures equal treatment of suppliers and transparency
Consider open vs closed procurement processes
Use a cross-functional team - particularly when marking responses
Conclusion - you could mention here that different sourcing activities may require more or less effort at each of the stages e.g. procuring a new item may require more market analysis than a re-buy.
Tutor Notes:
- If you want to add in extra details, you could think about ways procurement can add value at each stage
- In the old syllabus, CIPS were a bit obsessed with Michael Porter. In the Market Analysis bit you could talk about using Porter's 5 forces (buyer and supplier power, threat of new entrants, threat of substitutions, supplier rivalry) and Porter's 3 generic strategies for competing (cost leadership, differentiation, niche segment). This has been removed from the study guide so it's not essential to know this for this module, but if you've seen it before it's a nice one to throw in.
- You could also mention that there are differences between the public and private sector procurement at the different stages. E.g. Public Sector requires open competitions for contracts of a certain value and must follow the rules set out in Public Contract Regulations - the private sector doesn't have such strict regulations so there is much more flexibility in how tenders are completed. Also in the public sector, the evaluation criteria needs to be agreed beforehand and presented in the ITT- not the same for the private sector.
- Study guide p.71
Explanation:
How to approach this question:
- The Sourcing Cycle is the first half of the CIPS Procurement Cycle and includes these steps:
1) Define Business Need
2) Market Analysis + Make vs Buy
3) Develop Strategy and Plan
4) Pre-Procurement Market Testing
5) Develop Documents and Specification
6) Supplier Selection
7) Issue Tender
8) Bid Evaluation
9) Contract Award and Implementation
Your response should detail 5 of these. It is a good idea to pick the ones you know most about and where there is more to write about. You won't get any extra points for naming more than 5 so focus on getting as much detail down about 5, rather than explaining more of them.
Essay Plan
Introduction - explain what the sourcing cycle is - the stages of the procurement cycle before a contract is signed. It describes the steps an organisation will take to source/ procures goods or services.
Paragraph 1 - Define the business need
How is the need identified? E.g. by end user, stores department, ERP system.
Procurement should challenge this - is it really necessary? Suggest alternatives - this could be a key source of added value
Put together business case / requisition / project initiation document
What type of purchase? Straight rebuy, modified rebuy, new purchase
Decide on what type of specification would be best - Conformance vs performance specification
This stage may include early supplier involvement
Paragraph 2 - Market Analysis and Make vs Buy Decision
Create an Analysis by segmenting the market by buyer, product, distribution channel, geography, customer market etc.
Make vs Buy - use Carter's Matrix to decide whether the organisation should make vs buy.
Also consider outsourcing at this stage
Paragraph 3 - Documents and Specification
Draft documents. These may include a RFQ or ITT, a specification and a proposed form of contract
Specification may be conformance or performance based
A contract sets out the roles, rights, responsibilities and obligations of the parties and shows intention to enter into 'legal relations'
This stage defines the 'offer' which becomes binding once other party accepts
Documentation may also include proposed KPIs and SLAs
Paragraph 4 - Supplier Selection
For a new purchase, supplier selection is very important - investigation should be proportionate to the value of the procurement. For rebuys or low-risk purchases you could use the same supplier or a list of pre-approved suppliers.
You can locate potential suppliers by; catalogues, websites, trade registers, market exchanges and review sites, trade or industry press, fairs and conferences, networking and recommendations/ referrals.
You can shortlist suppliers by sending out a pre-qualification questionnaire. This adds value by reducing wasted time / costs / risks to entering into a contract with the wrong supplier.
Other criteria for supplier selection include using Carter's 10 Cs (competency, consistency, capability, control, cost, cash, clean, communication, culture, commitment), thesupplier's financial standing (e.g. liquidity and gearing), references and considering their CSR policy.
Paragraph 5 - Issue Tender
Competitive bidding should only be done when there's sufficient time and resources available, there's sufficient suppliers in the marketplace, they're keen to win business (ie that there's appetite for competition) and there is a strong specification
Best practice is to issue tenders electronically as it ensures equal treatment of suppliers and transparency
Consider open vs closed procurement processes
Use a cross-functional team - particularly when marking responses
Conclusion - you could mention here that different sourcing activities may require more or less effort at each of the stages e.g. procuring a new item may require more market analysis than a re-buy.
Tutor Notes:
- If you want to add in extra details, you could think about ways procurement can add value at each stage
- In the old syllabus, CIPS were a bit obsessed with Michael Porter. In the Market Analysis bit you could talk about using Porter's 5 forces (buyer and supplier power, threat of new entrants, threat of substitutions, supplier rivalry) and Porter's 3 generic strategies for competing (cost leadership, differentiation, niche segment). This has been removed from the study guide so it's not essential to know this for this module, but if you've seen it before it's a nice one to throw in.
- You could also mention that there are differences between the public and private sector procurement at the different stages. E.g. Public Sector requires open competitions for contracts of a certain value and must follow the rules set out in Public Contract Regulations - the private sector doesn't have such strict regulations so there is much more flexibility in how tenders are completed. Also in the public sector, the evaluation criteria needs to be agreed beforehand and presented in the ITT- not the same for the private sector.
- Study guide p.71
Explain the main differences between the Public Sector and the Private Sector (25 marks)
정답:
See the solution inExplanation partbelow.
Explanation:
Bottom of Form
Top of Form
- This is an open question. You could really talk about anything. Here's some ideas of content:
Example Essay
The public and private sectors, while both essential to a nation's economy, operate under different paradigms, primarily due to their distinct drivers, stakeholders, regulations, procurement aims, and supplier relationships.
Drivers
The most fundamental difference lies in their drivers. Private sector organizations are primarily profit-driven; their existence hinges on their ability to generate profits. This profit influences their strategies, operations, and overall objectives. Conversely, public sector organizations are not driven by profit. Funded by taxpayer money, their primary objective is to deliver services effectively and efficiently to the public. Their success is measured not in financial terms, but in how well they meet the service levels required by the citizens who finance them through taxes.
Stakeholders
The range and influence of stakeholders in the two sectors also differ markedly. In the public sector, the stakeholder base is much broader, encompassing every member of society who interacts with or benefits from public services like healthcare, policing, and road maintenance. However, these stakeholders typically have less power to influence policy or practices. In contrast, stakeholders in the private sector, such as shareholders and customers, often have a more significant influence on company policies and practices. The private sector's narrower stakeholder base allows for more direct impact and influence from these groups.
Regulations
Regulations in the public sector are generally more stringent than in the private sector. Public sector entities, governed by regulations like PCR 2015, must demonstrate sound procurement practices and are accountable to society at large. This contrasts with the private sector, where companies have more latitude in choosing suppliers and are not obliged to justify their decisions publicly. The private sector faces fewer regulatory constraints, allowing for more flexibility in business decisions.
Procurement Aims
Procurement in the public sector is guided by the principles of efficiency, economy, and effectiveness, often summarized as the '3 Es'. The focus is on achieving value for money, considering both quality and price. In contrast, private sector procurement is more diverse in its aims, reflecting the organization's specific goals, which could range from profit maximization to innovation or sustainability. The private sector's procurement decisions are more closely aligned with the organization's unique values and objectives.
Supplier Relationships
Finally, the nature of supplier relationships differs significantly between the two sectors. The public sector is mandated to maintain a certain distance from its suppliers, ensuring equal treatment and open competition, as dictated by regulations like the PCR. This contrasts with the private sector, where companies are free to develop closer, more strategic relationships with preferred suppliers. The private sector can engage in practices like partnerships and Early Supplier Involvement, which are typically not permissible in the public sector due to the need for impartiality and fairness.
In summary, while both sectors aim to deliver services or products effectively, the public sector's focus on service delivery for the public good, stringent regulations, broad stakeholder base, and specific procurement principles, sets it apart from the private sector's profit-driven, flexible, and more narrowly focused approach.
Tutor Notes
- At Level 4 the questions are usually explain or describe, so don't worry too much about doing an in depth
'compare and contrast' style of answer. They don't expect that level of detail here. Simply saying Public Sector does X and Private Sector does Y is all you need.
- I have mentioned PCR 2015 - if you're taking this exam in 2025 you may need to update this reference with the new regulations.
- LO 4.3 p.220 / p. 226
Explanation:
Bottom of Form
Top of Form
- This is an open question. You could really talk about anything. Here's some ideas of content:
Example Essay
The public and private sectors, while both essential to a nation's economy, operate under different paradigms, primarily due to their distinct drivers, stakeholders, regulations, procurement aims, and supplier relationships.
Drivers
The most fundamental difference lies in their drivers. Private sector organizations are primarily profit-driven; their existence hinges on their ability to generate profits. This profit influences their strategies, operations, and overall objectives. Conversely, public sector organizations are not driven by profit. Funded by taxpayer money, their primary objective is to deliver services effectively and efficiently to the public. Their success is measured not in financial terms, but in how well they meet the service levels required by the citizens who finance them through taxes.
Stakeholders
The range and influence of stakeholders in the two sectors also differ markedly. In the public sector, the stakeholder base is much broader, encompassing every member of society who interacts with or benefits from public services like healthcare, policing, and road maintenance. However, these stakeholders typically have less power to influence policy or practices. In contrast, stakeholders in the private sector, such as shareholders and customers, often have a more significant influence on company policies and practices. The private sector's narrower stakeholder base allows for more direct impact and influence from these groups.
Regulations
Regulations in the public sector are generally more stringent than in the private sector. Public sector entities, governed by regulations like PCR 2015, must demonstrate sound procurement practices and are accountable to society at large. This contrasts with the private sector, where companies have more latitude in choosing suppliers and are not obliged to justify their decisions publicly. The private sector faces fewer regulatory constraints, allowing for more flexibility in business decisions.
Procurement Aims
Procurement in the public sector is guided by the principles of efficiency, economy, and effectiveness, often summarized as the '3 Es'. The focus is on achieving value for money, considering both quality and price. In contrast, private sector procurement is more diverse in its aims, reflecting the organization's specific goals, which could range from profit maximization to innovation or sustainability. The private sector's procurement decisions are more closely aligned with the organization's unique values and objectives.
Supplier Relationships
Finally, the nature of supplier relationships differs significantly between the two sectors. The public sector is mandated to maintain a certain distance from its suppliers, ensuring equal treatment and open competition, as dictated by regulations like the PCR. This contrasts with the private sector, where companies are free to develop closer, more strategic relationships with preferred suppliers. The private sector can engage in practices like partnerships and Early Supplier Involvement, which are typically not permissible in the public sector due to the need for impartiality and fairness.
In summary, while both sectors aim to deliver services or products effectively, the public sector's focus on service delivery for the public good, stringent regulations, broad stakeholder base, and specific procurement principles, sets it apart from the private sector's profit-driven, flexible, and more narrowly focused approach.
Tutor Notes
- At Level 4 the questions are usually explain or describe, so don't worry too much about doing an in depth
'compare and contrast' style of answer. They don't expect that level of detail here. Simply saying Public Sector does X and Private Sector does Y is all you need.
- I have mentioned PCR 2015 - if you're taking this exam in 2025 you may need to update this reference with the new regulations.
- LO 4.3 p.220 / p. 226
Describe regulation that govern the Public Sectors and explain how this may impact upon procurement activities (25 marks).
정답:
See the solution inExplanation partbelow.
Explanation:
How to approach this question
- You do need to know some legislation for public sector here. This may be difficult if you don't work in the Public Sector. If you're struggling with this, you could also talk about general legislation that governs all types of organisations such as the Equalities Act and Modern Slavery Act.
- This is also a tough question if you're not British. CIPS is a UK based organisation and the syllabus therefore only talks about British legislation. If you're in a different country you could talk about the legislation in your own country, providing the question doesn't specifically mention UK Law.
- Either way I would recommend knowing a couple of pieces of British Legislation. You don't need to be an expert but just state what they are and what the purpose is should be enough to get you a pass.
Example essay
The public sector, which encompasses various governmental and state-owned enterprises, plays a pivotal role in the governance and provision of essential services. This sector operates under a strict framework of regulations and policies, ensuring that its operations are fair, transparent, and accountable. Among the most critical aspects of these operations is procurement, the process through which the public sector acquires goods, services, and works. This essay will explain key regulations governing the public sector, focusing on the Public Contracts Regulations (PCR) 2015, Late Payment Regulations 2016, Equalities Act2010, and Public Services (Social Value) Act 2012, and explores how these regulations impact procurement activities.
The Public Contracts Regulations (PCR) 2015
The PCR 2015 plays a foundational role in public sector procurement in the UK. It sets out the procedures for procuring contracts, aiming to ensure fairness and transparency in the process. The regulations mandate that all procurement processes must be conducted in a manner that prevents discrimination and allows equal access to potential contractors, regardless of their size or location. For example, the open tendering process under PCR
2015 has enabled a more diverse range of companies, including small and medium-sized enterprises, to participate in government contracts, enhancing competition and innovation. The four 'pillars' of the PCR are derived from EU Procurement Directives and are: non-discrimination, free movement of goods, equality of treatment and transparency.
Late Payment Regulations 2013
The Late Payment Regulations 2013 address a critical aspect of procurement: the timely payment for goods and services. This regulation ensures that public sector organizations pay their suppliers within a stipulated time frame, significantly impacting the financial stability of these suppliers. For instance, the regulation has been particularly beneficial for small businesses that rely on prompt payments to maintain cash flow. The introduction of these regulations has improved the trust between public sector entities and their suppliers, leading to more efficient procurement processes.
Equalities Act 2010
The Equalities Act 2010 is another crucial piece of legislation impacting public sector procurement. This Act prohibits discrimination in the workplace and in the provision of services, extending its influence to the procurement process. Public sector entities must ensure that their procurement decisions do not discriminate against any group and that they promote equality. For instance, when a public sector organization issues a tender, it must ensure that the selection criteria do not unfairly disadvantage any potential supplier based on irrelevant characteristics. This approach not only fosters a more inclusive procurement environment but also helps to tap into a wider talent and supplier pool, enhancing the quality and effectiveness of public services.
Public Services (Social Value) Act 2012
The Public Services (Social Value) Act 2012 marks a significant shift in how procurement is approached in the public sector. This Act requires public sector organizations to consider how the services they procure can improve the economic, social, and environmental well-being of their area. This means that when a public sector entity procures goods or services, it must consider factors beyond just the price and quality. For example, a local government might prioritize suppliers who can demonstrate a commitment to environmental sustainability or who offer employment opportunities to local residents. This approach to procurement encourages a more holistic view of value for money, factoring in the wider impact of procurement decisions on society.
Public Accountability and Freedom of Information Requests
In addition to these specific regulations, the concept of public accountability and the mechanism of Freedom of Information requests play a crucial role in the public sector, especially in procurement activities. Public accountability ensures that entities are answerable to the public and their actions are transparent. Freedom of Information requests enable individuals and organizations to access information held by public authorities, which includes details of procurement decisions and contracts. This transparency is critical in ensuring that procurement activities are conducted ethically and responsibly, deterring corruption and mismanagement.
In conclusion, the regulation of the public sector, particularly in the realm of procurement, are complex.
Regulations such as the PCR 2015, Late Payment Regulations 2016, Equalities Act 2010, and the Public Services (Social Value) Act 2012, along with the principles of public accountability and transparency, ensure that procurement activities are conducted in a fair, transparent, and socially responsible manner. These regulations not only safeguard the interests of suppliers, especially smaller businesses, but also ensure that the public sector remains a model of integrity and efficiency and that taxpayers' money is well spent.
Tutor Notes
- Okay this is important: The PCR 2015 regulations are being rescinded in 2024. They're based on EU Law and the UK has left the EU. I know we left a while ago now but it's taken us a long time to address the issue and figure out what we want to do about it. There was also a pandemic that got in the way of people making any decisions in parliament that weren't to do with Covid. The PCR 2015 will be replaced in late 2024 with new 'British' rather than European rules.
- At the time of writing this (December 2023) we don't 100% know what the new rules are going to look like and if you're taking this exam from November 2024 onwards, I recommend doing a bit of research into the new regulations.
- Now the complicated bit- the CIPS syllabus is valid from 2024-2028 and doesn't address that legislation is changing. I therefore don't really know what they're going to expect when students are taking this exam and the study guide information is out of date. If you're not working in the Public Sector, how are you to know the legislation has changed?
- My advice is this- briefly learn PCR 2015- the four pillars in particular, and when the new legislation comes out, have a quick google and see if these pillars are still the same. The regs aren't going to change THAT much - things like transparency and equal treatment are still going to be really important, but there may be some slight language changes. Plus, if you're able to mention in an essay that there's new legislation, it's going to make you sound super clever.
- LO 4.2 p.211
Explanation:
How to approach this question
- You do need to know some legislation for public sector here. This may be difficult if you don't work in the Public Sector. If you're struggling with this, you could also talk about general legislation that governs all types of organisations such as the Equalities Act and Modern Slavery Act.
- This is also a tough question if you're not British. CIPS is a UK based organisation and the syllabus therefore only talks about British legislation. If you're in a different country you could talk about the legislation in your own country, providing the question doesn't specifically mention UK Law.
- Either way I would recommend knowing a couple of pieces of British Legislation. You don't need to be an expert but just state what they are and what the purpose is should be enough to get you a pass.
Example essay
The public sector, which encompasses various governmental and state-owned enterprises, plays a pivotal role in the governance and provision of essential services. This sector operates under a strict framework of regulations and policies, ensuring that its operations are fair, transparent, and accountable. Among the most critical aspects of these operations is procurement, the process through which the public sector acquires goods, services, and works. This essay will explain key regulations governing the public sector, focusing on the Public Contracts Regulations (PCR) 2015, Late Payment Regulations 2016, Equalities Act2010, and Public Services (Social Value) Act 2012, and explores how these regulations impact procurement activities.
The Public Contracts Regulations (PCR) 2015
The PCR 2015 plays a foundational role in public sector procurement in the UK. It sets out the procedures for procuring contracts, aiming to ensure fairness and transparency in the process. The regulations mandate that all procurement processes must be conducted in a manner that prevents discrimination and allows equal access to potential contractors, regardless of their size or location. For example, the open tendering process under PCR
2015 has enabled a more diverse range of companies, including small and medium-sized enterprises, to participate in government contracts, enhancing competition and innovation. The four 'pillars' of the PCR are derived from EU Procurement Directives and are: non-discrimination, free movement of goods, equality of treatment and transparency.
Late Payment Regulations 2013
The Late Payment Regulations 2013 address a critical aspect of procurement: the timely payment for goods and services. This regulation ensures that public sector organizations pay their suppliers within a stipulated time frame, significantly impacting the financial stability of these suppliers. For instance, the regulation has been particularly beneficial for small businesses that rely on prompt payments to maintain cash flow. The introduction of these regulations has improved the trust between public sector entities and their suppliers, leading to more efficient procurement processes.
Equalities Act 2010
The Equalities Act 2010 is another crucial piece of legislation impacting public sector procurement. This Act prohibits discrimination in the workplace and in the provision of services, extending its influence to the procurement process. Public sector entities must ensure that their procurement decisions do not discriminate against any group and that they promote equality. For instance, when a public sector organization issues a tender, it must ensure that the selection criteria do not unfairly disadvantage any potential supplier based on irrelevant characteristics. This approach not only fosters a more inclusive procurement environment but also helps to tap into a wider talent and supplier pool, enhancing the quality and effectiveness of public services.
Public Services (Social Value) Act 2012
The Public Services (Social Value) Act 2012 marks a significant shift in how procurement is approached in the public sector. This Act requires public sector organizations to consider how the services they procure can improve the economic, social, and environmental well-being of their area. This means that when a public sector entity procures goods or services, it must consider factors beyond just the price and quality. For example, a local government might prioritize suppliers who can demonstrate a commitment to environmental sustainability or who offer employment opportunities to local residents. This approach to procurement encourages a more holistic view of value for money, factoring in the wider impact of procurement decisions on society.
Public Accountability and Freedom of Information Requests
In addition to these specific regulations, the concept of public accountability and the mechanism of Freedom of Information requests play a crucial role in the public sector, especially in procurement activities. Public accountability ensures that entities are answerable to the public and their actions are transparent. Freedom of Information requests enable individuals and organizations to access information held by public authorities, which includes details of procurement decisions and contracts. This transparency is critical in ensuring that procurement activities are conducted ethically and responsibly, deterring corruption and mismanagement.
In conclusion, the regulation of the public sector, particularly in the realm of procurement, are complex.
Regulations such as the PCR 2015, Late Payment Regulations 2016, Equalities Act 2010, and the Public Services (Social Value) Act 2012, along with the principles of public accountability and transparency, ensure that procurement activities are conducted in a fair, transparent, and socially responsible manner. These regulations not only safeguard the interests of suppliers, especially smaller businesses, but also ensure that the public sector remains a model of integrity and efficiency and that taxpayers' money is well spent.
Tutor Notes
- Okay this is important: The PCR 2015 regulations are being rescinded in 2024. They're based on EU Law and the UK has left the EU. I know we left a while ago now but it's taken us a long time to address the issue and figure out what we want to do about it. There was also a pandemic that got in the way of people making any decisions in parliament that weren't to do with Covid. The PCR 2015 will be replaced in late 2024 with new 'British' rather than European rules.
- At the time of writing this (December 2023) we don't 100% know what the new rules are going to look like and if you're taking this exam from November 2024 onwards, I recommend doing a bit of research into the new regulations.
- Now the complicated bit- the CIPS syllabus is valid from 2024-2028 and doesn't address that legislation is changing. I therefore don't really know what they're going to expect when students are taking this exam and the study guide information is out of date. If you're not working in the Public Sector, how are you to know the legislation has changed?
- My advice is this- briefly learn PCR 2015- the four pillars in particular, and when the new legislation comes out, have a quick google and see if these pillars are still the same. The regs aren't going to change THAT much - things like transparency and equal treatment are still going to be really important, but there may be some slight language changes. Plus, if you're able to mention in an essay that there's new legislation, it's going to make you sound super clever.
- LO 4.2 p.211