최신 LEED-AP-BD-C 무료덤프 - USGBC LEED AP Building Design + Construction (LEED AP BD+C)
An HVAC system consists of an air handler supplying conditioned air (mixture of return air and outdoor air) to an office, corridor, conference room and lobby. For Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance, the ventilation rate procedure calculations must be based upon what HVAC system configuration?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The material cost for a project is $100,000. What is the minimum material value needed to achieve Materials and Resources Credit, Building Disclosure and Optimization, Sourcing of Raw Materials, Option 2. Leadership Extraction Practices?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
Whole-Building Life-Cycle Assessment is a
Whole-Building Life-Cycle Assessment is a
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
A facility manager cleaning highly reflective paving material is
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Several Materials and Resources credits give a bonus location valuation factor, which allows products extracted, manufactured and produced within 100 mi. (161 km) of the project to take double valuation in credit calculations. The intent of this bonus is
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
What information must be provided to demonstrate compliance with the Owner's Project Requirements (OPR)?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Commissioning (Cx) and verification are requirements to qualify for LEED certification. What are the basic systems that need to be commissioned?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A project team is using the whole building simulation model to quantify the percentage of energy savings for the project. Which of the following should remain the same for both the baseline building and the proposed building?
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Which principal areas must the LEED AP focus on to attain the Integrative Process Credit, Integrative Process?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following strategies can be used to reduce the internal load of a building?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A project team is deciding on the impact of a proposed concrete walkway. Which of the following will be impacted as a result of adding the walkway?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)