최신 LEED-AP-BD-C 무료덤프 - USGBC LEED AP Building Design + Construction (LEED AP BD+C)

Under Energy and Atmosphere Credit: Optimize Energy Performance, Option 1: Whole-Building Energy Simulation, how can the energy cost savings be accurately determined?

정답: D
Which of the following strategies can be used to decrease the envelope load of a building?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A design team pursuing LEED for a new office building project calculated that with the water fixtures specified for the project, a 24% water reduction can be achieved compared to the LEED baseline. What does this mean to the team in terms of pursuing LEED?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Smoking is prohibited inside LEED-certified buildings in order to eliminate the health risks associated with environmental tobacco smoke. Which building type is exempt from this requirement?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
A building owner is considering the installation of a solar thermal panel on the roof of the building. The initial cost of the system is higher than a conventional natural gas system. Which of the following is true to make the renewable energy option economically feasible?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The results of a building energy model show that a building will consume 2,200,435 kilowatt-hours (kWh) per year (building is served solely by electricity). The building owner wants to achieve Energy and Atmosphere Credit, Green Power and Carbon Offsets. What is the minimum amount of green energy required to be purchased on an annual basis?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
A developer is considering an urban infill site for a new commercial building rather than a rural greenfield site adjacent to a stream. Which of the following is an economic advantage of the infill site?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
For Energy and Atmosphere Credit, Advanced Energy Metering, what is the minimum amount of time that the metering system should store data?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
A project's massing and site orientation can have a direct impact on which of the following prerequisites?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Large commercial buildings are most often dominated by

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Additional Enhanced IAQ Strategies

정답: D
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기