According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing building should identify

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
The site of a new open-plan office building is located near a highway. The acoustic consultant is investigating the possibility of using sound masking system to cover the noise impact from the busy road. If sound masking is found to be a feasible option, the noise design of the project can have a maximum limit up to

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

정답: C
The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable area. The project build-out will include all new HVAC systems. Operable windows are installed as follows:
A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces
. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces
Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
The Commissioning Authority (CxA) must report results, findings and recommendations directly to the

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
What primary role does the LEED AP have during the LEED certification process?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Which strategy could be incorporated into the negotiations of a lease agreement between a tenant and building owner to contribute towards earning a LEED credit?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A project team is pursuing certification for a medical clinic with 150 full time employees and 250 peak visitors. The project team is considering the Location and Transportation Credit for Bicycle Facilities.
Providing which of the following is a minimum requirement to earn the credit?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)