최신 LEED-AP-ND 무료덤프 - USGBC LEED AP Neighborhood Development (LEED ND)

A 10-acre ((our hectare) project has 5.000 ft (1 524 m) of sidewalks Trees and trellises are planned along several ofthose blocks to provide shading for the sidewalks In order to achieve Neighborhood Pattern and Design Credit Tree-Lined and Shaded Streetscapes. what is the minimum shaded sidewalk that would need to be provided?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
A mixed-use LEED for Neighborhood Development project includes a 20,000 ft2 (1.858 m2) office building with retail space on the first floor. There are 1.000 ft7 (93 m2) surface parking lots located on each of Ihe four sides of the budding.
Who! improvement is needed to make the plan eligible for Neighborhood Pattern and Design Credit. Reduced Parking Footprint?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
In ardor to achieve the Neighborhood Pattern and Design Credit. Visit ability and Universal Design. the owner of a new six-unit residential building has decided to incorporate universal design strategies throughout each home. Which of the following features contributes to mat credit?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
A project team would like to attempt the credit Transit Facilities' and is working with the local transit agency to inventory the existing and proposed bus stops within the project boundary. Oi the five proposed bus stops, one stop will be in operation at the same time when the project completes, and two stops will be in operation in the second year alter the project's completion. The remaining two bus stops will be in operation m me third year after the project's completion. How many proposed bus stops can the project team Include in the application form to attempt the credit?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following strategies is a best practice for reducing a project's development footprint?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
A project calculates an overall annual heating and/or cooling consumption reduction using an energy efficiency model. Whichcredit would this calculation aid in documenting?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following can be included within the boundary of a project site on an urban waterfront?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
The baseline energy use for the Green Infrastructure and Buildings credit. Infrastructure Energy Efficiency is calculated by using

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.
What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Which of thefollowing site conditions should be considered in the selection of renewable energy technologies for Green Infrastructure and Buildings Credit. Renewable Energy Production?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기