In ardor to achieve the Neighborhood Pattern and Design Credit. Visit ability and Universal Design. the owner of a new six-unit residential building has decided to incorporate universal design strategies throughout each home. Which of the following features contributes to mat credit?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
What Is the maximum distance from the project's geographic center thata community garden outside the project boundary can be located in order to satisfy the requirement for Neighborhood Pattern and Design Credit,Local Food Production?

정답: A
Whichof the following sites meets the Minimum Program Requirements (MPR) fora project targeting LEED for Neighborhood Development certification?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Acultural landscape is identifiedon a project site. Which action contributes to Green Infrastructure and Buildings Credit. Historic Resource Preservation and Adaptive Reuse?

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
For credits requiring bicycle storage as well as shower and changing facilities, shower requirements may be met in office buildings by providing

정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A mixed-use development's total building area is 1.742.400 ft1 (161 874 m2) with 350 planned dwelling units Within a 1/2 mi. (08 km) walking distance are 20 diverse uses totaling 550.000 ft2 (51 096 m2) and 375 full- time jobs.
To achieve Smart Location and Linkage Credit. Housing and Jobs Proximity, what is the minimum areaof the residential component ofthe project?

정답: D
To achieve Neighborhood Pattern and Design Credit. Community Outreach and involvement. Option 1:
Community Outreach during Preliminary Design, the project team must advertise and host at leastone community meeting. Which of thefollowing is an example ofa community meeting that is applicable towards this credit?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
As defined by the Minimum Program Requirements, theLEED project boundary includes the

정답: A
The total area of all buildings on a project is 125,000 ft2 (11 612 m2). 63.750 ft2 (5.922 m2) of the project is within 1/2 mi (800 m) of 11 diverse uses and 106.240 ft2 (9.870 m2) of the project buildings are oriented for maximum solar orientation. What credit is the project eligible to achieve?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
A project team has arranged to use recycled infrastructure components. Thirty percent (30%) by mass ot the new material infrastructure components contain post-consumer recycled content. Ten percent (10%) by mass of the infrastructure is on-site reuse materials.
What Is the minimum additional percentage of recycled content (by mass) that must come from pre-consumer materials?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)