최신 LEED-AP-O-M 무료덤프 - USGBC LEED AP Operations +Maintenance (LEED AP O+M)

What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
A building owner wishes to provide better Indoor Environmental Quality to the building occupants while containing capital costs. The LEED AP suggests pursuing Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2. Filtration. However, the existing HVAC system was not designed to accommodate the required filters but is otherwise efficient and operating well. Which strategy would enable credit achievement?

정답: D
설명: (DumpTOP 회원만 볼 수 있음)
A new office building was LEED Gold certified, and the tenants have occupied the space for one month. The property manager would like to certify the building under LEED for Building Operations and Maintenance:
Existing Buildings.
What program requirements apply?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios.
Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following best meets requirements of Sustainable Sites Credit, Site Development - Protect or Restore Habitat?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
The development of a five-year plan under Sustainable Sites Credit, Site Improvement Plan contributes to the achievement of

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
What is the maximum distance food or beverage raw materials can be harvested and produced in order to achieve the Materials and Resources Credit, Purchasing - Ongoing?

정답: B
설명: (DumpTOP 회원만 볼 수 있음)
An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a non-potable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which non-potable water source would be the most appropriate for use?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following options about project boundaries is correct?

정답: A
설명: (DumpTOP 회원만 볼 수 있음)

우리와 연락하기

문의할 점이 있으시면 메일을 보내오세요. 12시간이내에 답장드리도록 하고 있습니다.

근무시간: ( UTC+9 ) 9:00-24:00
월요일~토요일

서포트: 바로 연락하기