최신 LEED-AP-O-M 무료덤프 - USGBC LEED AP Operations +Maintenance (LEED AP O+M)
The decision to replace Chlorofluorocarbon (CFC) and Hydrochlorofluorocarbon (HCFC) refrigerants with alternative refrigerants
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Cooling tower blowdown is necessary because
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
What is the maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation?
Calculator
Calculator
정답: D
설명: (DumpTOP 회원만 볼 수 있음)
Which materials or products are covered in Materials and Resources Prerequisite, Facility Maintenance and Renovations Policy?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
Landscape irrigation practices consume large quantities of potable water. By evaluating the project's outdoor water budget and irrigation water demand early in the Establishment Period in Water Efficiency Credit, Outdoor Water Use Reduction project teams will be able to
정답: D
The project team of an existing urban site has 4% total vegetated area and desires to increase the percentage to equal or be greater than 5%. Which strategy can the team implement to achieve this goal?
정답: A
설명: (DumpTOP 회원만 볼 수 있음)
An ASHRAE Level 1 walkthrough analysis contributes to what prerequisite or credit?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)
Which of the following environmental concerns is exacerbated by impervious surfaces?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
A LEED AP would like to maximize the response rate of the transportation survey in the building. What methods would be acceptable?
정답: C
설명: (DumpTOP 회원만 볼 수 있음)
For existing buildings pursuing LEED certification, the establishment period requirements include which of the following?
정답: B
설명: (DumpTOP 회원만 볼 수 있음)