최신 NCSE-Level-1 무료덤프 - Nutanix Certified Systems Engineer (NCSE): Level 1

Prospective customer explains their current infrastructure and upcoming goals. They are a fast-growing software company with approximately 3000 employees. Engineering accounts for approximately half of total staff and is behind on product releases.
This department has been building their own infrastructure using available hardware, SaaS offerings, and public cloud.
There's a new CIO attempting to gain control of existing and incoming
information systems while supporting the agile environment responsible for their rapid innovation with a minimal staff. From this information, which two addressable pain points or gaps should be discerned?(Choose two)

정답: B,C
A prospect provides the following details for sizing active working set based on their existing server virtualization environment:
Full backup reports:
January: 10TB
February: 11TB
March: 12TB
April: 13TB
May: 14TB
Average Read/Write Ratio - 75/25
When entering a Raw Input in Sizer, what should the SE use as the minimum amount of required SSD Storage?

정답: C
An SE needs to size a new project that requires offsite backup but not remote disaster recovery. The prospect requires an RTO of 48 hours, RPO of 4 hours, and the ability to restore from the past 5days of backups. The prospect's data change rate is 1%.


How should the SE configure Sizer for this scenario?

정답: A
Which two items represent measurable POC success criteria? (Choose two.)

정답: A,C
An SE is working with a financial institution prospect on a VDI environment refresh. The institution currently has 5000 named VDI users, with a peak of 2800 concurrent users.
How many VDI VMs does the SE need to size for, factoring in an additional 10% for growth?

정답: A
An SE is working to size a prospects environment that includes production Oracle databases.
Which Oracle output should the SE request from the prospect to collect accurate sizing information?

정답: D
An SE builds a Sizer scenario for SQL server running on Cisco C240 M4 servers.
Using only the Sizer BOM, which two actions can be performed? (Choose two)

정답: A,B
AN SE determines that a POC is necessary to overcome competitive FUD in an opportunity with an Enterprise account evaluating several HCI solutions. The customer will evaluate three solutions in their datacenter simultaneously over the course of 4 days.
The customer schedules all necessary personnel to be available during this time.
Which two network planning items should the SE determine prior to allocation hardware for the POC?
(Choose two)

정답: A,E